Show simple item record

dc.contributor.authorHorton, Joseph W.
dc.contributor.authorParr, David F.
dc.date.accessioned2022-08-05T14:21:48Z
dc.date.available2022-08-05T14:21:48Z
dc.date.issued1976-10
dc.identifier.urihttp://digital.library.wisc.edu/1793/83435
dc.description.abstractA proposal to use sediments dredged from the Superior=Duluth Harbor as construction material for the proposed Arrowhead High Bridge has been the impetus be­ hind this study. The focus of the study is a comparison of geological and chemical characteristics of dredged material which has already been utilized in highway construction, with that of other Pleistocene aged sediments which might be employed for the construction of the Arrowhead Bridge.en_US
dc.description.sponsorshipWI DOTen_US
dc.language.isoen_USen_US
dc.subjectchemicalsen_US
dc.subjecthighway construction materialsen_US
dc.subjectDouglas County, WIen_US
dc.titleCHEMICAL AND PHYSICAL ANALYSES OF SELECTED HIGHWAY CONSTRUCTION MATERIALS IN DOUGLAS COUNTY, WISCONSINen_US
dc.typeTechnical Reporten_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record