Team No.3: Turbine Rear Frame.
Subject
Value Analysis (Cost Control)
Economic Engineering
Results
Slide
R. Fountain Collection
Permanent Link
http://digital.library.wisc.edu/1793/6200Type
Learning Object
Description
Results of an 18-member team task force on a jet engine (20 slides; folders 165-184). Some information has been deleted. Task forces were usually full time for 4-16 weeks depending upon size of project. The first two in GE were conducted in 1960 and wer