• Login
    View Item 
    •   MINDS@UW Home
    • MINDS@UW Madison
    • College of Engineering, University of Wisconsin--Madison
    • Research Centers--College of Engineering
    • Wisconsin Transportation Center
    • National Center for Freight and Infrastructure Research and Education (CFIRE)
    • View Item
    •   MINDS@UW Home
    • MINDS@UW Madison
    • College of Engineering, University of Wisconsin--Madison
    • Research Centers--College of Engineering
    • Wisconsin Transportation Center
    • National Center for Freight and Infrastructure Research and Education (CFIRE)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Implementation of GPS controlled highway construction equipment - phase II

    Thumbnail
    File(s)
    Final report (4.460Mb)
    Date
    2008-01
    Author
    Vonderohe, Alan
    Publisher
    National Center for Freight and Infrastructure Research and Education
    Metadata
    Show full item record
    Abstract
    During 2006, WisDOT and the Construction Materials and Support Center at UW-Madison worked together to develop a specification and QC/QA procedures for GPS machine guidance on highway construction grading operations. These specifications and procedures are intended for incorporation in contracts on two to five pilot projects during the 2007 construction season. The 2006 work, and the 2007 pilot projects are the first two steps in a phased implementation plan that includes refinement of the specification and procedures after the 2007 pilots, additional pilots during 2008, and potential statewide implementation of optional GPS machine guidance for grading on 2009 contracts. To be effective, the goals, objectives, and methods for data collection and analysis for the 2007 pilot projects must be well-articulated; the project sites must be carefully selected; and a set of deliverables and management plan for coordination of the effort must be developed.
    Subject
    Road construction
    Quality control
    Quality assurance
    Grading (Earthwork)
    Global Positioning System
    Contractors
    Contract administration
    Construction and maintenance equipment
    Permanent Link
    http://digital.library.wisc.edu/1793/55957
    Type
    Technical Report
    Description
    103 p.
    Part of
    • National Center for Freight and Infrastructure Research and Education (CFIRE)

    Contact Us | Send Feedback
     

     

    Browse

    All of MINDS@UWCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Contact Us | Send Feedback