Now showing items 1-2 of 2

    • Implementation of GPS controlled highway construction equipment - phase II 

      Vonderohe, Alan (National Center for Freight and Infrastructure Research and Education, 2008-01)
      During 2006, WisDOT and the Construction Materials and Support Center at UW-Madison worked together to develop a specification and QC/QA procedures for GPS machine guidance on highway construction grading operations. These ...
    • Implementation of GPS controlled highway construction equipment - phase III 

      Vonderohe, Alan (National Center for Freight and Infrastructure Research and Education, 2009-02)
      Beginning in 2006, WisDOT and the Construction Material and Support Center (CMSC) at UW-Madison worked together to develop the specifications and the QA/QC procedures for GPS machine guidance on highway grading projects. ...