• Login
    View Item 
    •   MINDS@UW Home
    • MINDS@UW Madison
    • College of Engineering, University of Wisconsin--Madison
    • Research Centers--College of Engineering
    • Wisconsin Transportation Center
    • Midwest Regional University Transportation Center
    • View Item
    •   MINDS@UW Home
    • MINDS@UW Madison
    • College of Engineering, University of Wisconsin--Madison
    • Research Centers--College of Engineering
    • Wisconsin Transportation Center
    • Midwest Regional University Transportation Center
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    A systematic process for using federal aid to support bridge preventive maintenance

    Thumbnail
    File(s)
    Final report (1014.Kb)
    Date
    2008-11
    Author
    Adams, Teresa M.
    Pincheira, Jose A.
    Kang, Myungook
    Publisher
    Midwest Regional University Transportation Center
    Metadata
    Show full item record
    Abstract
    Preventive maintenance (PM) is recognized as a cost?effective way to preserve the investment in and service life of highway bridges. State agencies, including Wisconsin, are performing bridge PM projects. SAFETEA-LU 23 U.S.C. 144(d) made States eligible to use Federal Highway Bridge Program (HBP) funds to support bridge preventive maintenance provided they demonstrate a systematic process for the PM program. Each State is to work with their Federal Highway Administration (FHWA) Division Office to document and approve the systematic process. Some State?s applications are successful and others are not. This report discusses concepts and essential characteristics of a systematic process for bridge PM with examples. The information presented herein was prepared based upon conversations with the FHWA Offices of Asset Management and Bridge Technology and by review of documents describing the successfully approved bridge PM programs of eight State transportation agencies. To assist the Wisconsin Department of Transportation (WisDOT) and other State agencies, examples from several States are organized into a template for preparing a bridge PM plan that includes the essential features of a systematic process. The results are expected to help State agencies understand and apply the concepts when establishing bridge PM programs and prepare proposals to obtain approval to use HBP funds for bridge preventive maintenance projects.
    Subject
    Asset management
    Bridge maintenance
    Preventive maintenance
    Highway bridges
    Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users
    SAFETEA-LU
    Service life
    Permanent Link
    http://digital.library.wisc.edu/1793/54140
    Type
    Technical Report
    Description
    36 p.
    Part of
    • Midwest Regional University Transportation Center

    Contact Us | Send Feedback
     

     

    Browse

    All of MINDS@UWCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Contact Us | Send Feedback