Show simple item record

dc.contributor.advisorVoss, Tomen_US
dc.contributor.authorGutierrez, Federico A.en_US
dc.date.accessioned2010-04-28T21:28:38Z
dc.date.available2010-04-28T21:28:38Z
dc.date.issued2000en_US
dc.identifier.urihttp://digital.library.wisc.edu/1793/39483
dc.descriptionPlan Ben_US
dc.description.abstractThis study examined the Aislantes Industriales de Monterrey S.A. (AIMSA), in Monterrey, NL Mexico, and provided a possible solution for increasing throughput by the reduction of equipment failure. Using observation techniques to measure the number and frequency of machine failures rates within a determinate time, AIMSA was analyzed. The objective of this study was to examine the “run-to-failure” solution activities of AIMSA, complete recommended maintenance system schedule and document. Decisions and recommendations were made through an analysis of AIMSA and presented to the management.
dc.language.isoen_US
dc.publisherUniversity of Wisconsin--Stout
dc.subject.lcshPlant maintenanceen_US
dc.titleMaintenance program implementation at Aislantes Industriales de Monterreyen_US
dc.typeThesis
thesis.degree.levelM.S.en_US
thesis.degree.disciplineManagement Technology


Files in this item

Thumbnail

This item appears in the following Collection(s)

  • UW-Stout Masters Thesis Collection - Plan B
    This collection holds UW-Stout Masters Theses within the Plan B format. Theses pre-1999 are located on microfilm and will need to be requested from the archives. Contact archives@uwstout.edu for access.

Show simple item record