Browsing UW-Stout Masters Thesis Collection - Plan B by Author "Lacksonen, Tom"
Now showing items 1-4 of 4
-
Architectural participatory design methods
Hurst, Felicia (University of Wisconsin--Stout, 2000)A comprehensive review of literature was done to research various participatory architectural design methods. Secondly, research was conducted in form of a pilot study to test some of the participatory design methods. The ... -
Implementation of lean thinking and six sigma for Company XYZ: a case study in service parts warehouse
Chongwatpol, Jongsawas (University of Wisconsin--Stout, 2004)The company has reported errors in receiving and shipping products, which result in increased cost, inventory level, lead time, and customer service impact from the time products arrived to warehouse to the time products ... -
Prioritization and optimization of software deployment: rationale for large scale software upgrade to enhance performance and deployment methodologies to minimize time to completion, and the effects of managerial and political interference in information technology strategic decisions
Howard, Dominic (University of Wisconsin--Stout, 2001)As technology continues to advance, companies are forced to keep up with these changes or lose their competitive advantage. However, there are significant costs also associated with the implementation or acquisition and ... -
Reengineering the process of manufacturing thermal-cryogenics tanks
Lozada, Luis O. (University of Wisconsin--Stout, 2001)This research study takes place at Chart Industries/Storages System Division in New Prague, Minnesota. The researcher employs the concepts of batches, line balancing, and layouts to help CHART Industries to increase ...
