dc.date.accessioned | 2006-01-27T17:58:59Z | |
dc.date.available | 2006-01-27T17:58:59Z | |
dc.date.issued | 1964 | en_US |
dc.identifier.other | UW-Madison Wendt Library: Miles Collection I -- Slide 244 | en_US |
dc.identifier.uri | http://digital.library.wisc.edu/1793/3862 | |
dc.description | Illustration of how the job plan was used: an actual, successfully implemented study at the Jet Engine Department, GE (Folders #: 239-250). Slides were taken by the Jet Engine Department and all were taken of material used in 1964. | en_US |
dc.format.extent | 89658 bytes | |
dc.format.mimetype | image/jpeg | |
dc.language | English | en_US |
dc.language.iso | en_US | |
dc.subject | Value Analysis (Cost Control) | en_US |
dc.subject | Economic Engineering | en_US |
dc.subject | Methodology | en_US |
dc.subject | Results | en_US |
dc.subject | Slide | en_US |
dc.subject | R. Fountain Collection | en_US |
dc.title | Illustration of how the job plan was used: an actual, successfully implemented study at the Jet Engine Department, GE (Folders #: 239-250).--Slide | en_US |
dc.type | Learning Object | en_US |