• Login
    Search 
    •   MINDS@UW Home
    • MINDS@UW Madison
    • College of Engineering, University of Wisconsin--Madison
    • Research Centers--College of Engineering
    • Wisconsin Transportation Center
    • Wisconsin Highway Research Program
    • Search
    •   MINDS@UW Home
    • MINDS@UW Madison
    • College of Engineering, University of Wisconsin--Madison
    • Research Centers--College of Engineering
    • Wisconsin Transportation Center
    • Wisconsin Highway Research Program
    • Search
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Search

    Show Advanced FiltersHide Advanced Filters

    Filters

    Use filters to refine the search results.

    Now showing items 1-3 of 3

    • Sort Options:
    • Relevance
    • Title Asc
    • Title Desc
    • Issue Date Asc
    • Issue Date Desc
    • Results Per Page:
    • 5
    • 10
    • 20
    • 40
    • 60
    • 80
    • 100
    Thumbnail

    Field measurement of water-cement ratio for Portland cement concrete. Phase II, Field evaluation and development 

    Dowell, Amy; Cramer, Steven (Wisconsin Highway Research Program, 2002-06)
    The water-cementitious material ratio (w-cm) is defined as the ratio by mass of free water to cementitious material in a concrete mix. The microwave oven method (AASHTO provisional standard TP23-93) and the nuclear ...
    Thumbnail

    Assessment and rehabilitation strategies/guidelines to maximize the service life of concrete structures 

    Huang, Ying-Hua; Adams, Teresa M.; Pincheira, Jose A. (Wisconsin Highway Research Program, 2002-02)
    This report presents a spreadsheet tool for evaluating life-cycle maintenance strategies for existing concrete bridge decks that have deteriorated as a result of chloride-induced corrosion. The spreadsheet tool construct ...
    Thumbnail

    Determining a temperature-density relationship after completed rolling of HMA 

    Russell, Jeffrey; Loh, Ssu-Weh; Schoenfelder, Stephen; Hanna, Awad; Bahia, Hussain (Wisconsin Highway Research Program, 2002-01)
    During the past few years, the implementation of the nuclear gauge method of testing hot mix asphalt for desired compaction has proven a on-destructive and timesaving option. However, discrepancies between contractors' and ...

    Contact Us | Send Feedback
     

     

    Browse

    All of MINDS@UWCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects

    My Account

    Login

    Discover

    AuthorAdams, Teresa M. (1)Bahia, Hussain (1)Cramer, Steven (1)Dowell, Amy (1)Hanna, Awad (1)Huang, Ying-Hua (1)Loh, Ssu-Weh (1)Pincheira, Jose A. (1)Russell, Jeffrey (1)Schoenfelder, Stephen (1)Subjectbridge decks (1)Calibration (1)concrete deterioration (1)Density (1)Field tests (1)Fly ash (1)Hot mix paving mixtures (1)Igneous rocks (1)LCAA (1)Limestone aggregates (1)... View MoreDate Issued
    2002 (3)
    Has File(s)Yes (3)

    Contact Us | Send Feedback