Now showing items 3-4 of 4

    • Investigation of standard penetration torque testing (SPT-T) to predict pile performance 

      Komurka, Van; Wagner, Alan; Winter, Charles J. (Wisconsin Highway Research Program, 2005-09)
      Soil/pile set-up is a time-dependant increase in pile capacity. Incorporation of soil/pile set-up in pile design often has considerable economic benefits, resulting from reduction in pile section, length, and/or size of ...
    • Rapid bridge construction technology, precast elements for substructures 

      Okumus, Pinar; Oliva, Michael; Unlu, Demirhan (Wisconsin Highway Research Program, 2011-06)
      The goal of this research was to propose an alternate system of precast bridge substructures which can substitute for conventional cast in place systems in Wisconsin to achieve accelerated construction. Three types of ...