Target
File(s):
- 653.pdf (693.9Kb PDF)
- Author(s)
- Date
- May 1963
- Subject(s)
- Economic Engineering; Results; Production Magazine; Value Analysis (Cost Control)
- Description
- Features GE's use of VA in design, manufacturing and purchasing to reduce costs. Several examples. [Perhaps co-authored by L. D. Miles--not clear from context.]
- Permanent link
- http://digital.library.wisc.edu/1793/5484
- Export
- Export to RefWorks