Design-to-cost guidelines for defense contractors. (Value Engineering Management Bulletin No. 5)
File(s):
- 1334.pdf (1.779Mb PDF)
- Author(s)
- Date
- 1975
- Subject(s)
- Value Analysis (Cost Control); Economic Engineering; Cost; Defense; Pamphlet; F. Sherwin Collection
- Description
- Guidelines for integration of contractor value engineering with the design to cost process. Includes contractual requirments and contractor policy.
- Permanent link
- http://digital.library.wisc.edu/1793/4194
- Export
- Export to RefWorks